How to reasonably arrange the decoration time

2022-07-22
  • Detail

When decorating a home, owners usually put a lot of energy on home decoration design and the purchase of main materials, and often ignore the reasonable arrangement of decoration time. This situation often leads to the staggering time during the decoration period, or increases the overall decoration cost due to the project delay. The early stage of decoration is mainly decoration design. It takes 10-15 days from the selection of decoration company to the determination of design scheme. During this period of time, customers have to choose the main materials for decoration

when decorating a home, owners usually put a lot of energy on home decoration design and the purchase of main materials, and often ignore the reasonable arrangement of decoration time. This situation often leads to the staggering time during the decoration period, or increases the overall decoration cost due to the project delay

the early stage of decoration is mainly decoration design. It takes 10-15 days from the selection of decoration company to the determination of design scheme. During this period, customers also need to choose the main materials used for decoration, especially ceramic tiles and cabinets, because cabinets are generally customized, which takes 20-35 days to complete. Professional cabinet designers should also design the kitchen according to the actual situation, such as determining the location of the water circuit, so as to carry out water and electricity transformation in time after construction. Ceramic tiles are the first to be used after construction, so in the early stage of decoration, we must first select cabinets and ceramic tiles

it is understood that it takes about 45 days from the beginning to the completion to decorate a three bedroom house of 140-150 square meters. The small two bedroom apartment with small area can save fourorfive days, while the duplex apartment with more than 200 square meters needs fourorfive more days. The process of house decoration can be divided into three stages: early stage, middle stage and late stage

the middle stage of decoration is mainly the construction period. After the commencement, the water electrician and carpenter will go to the construction site. The transformation of water circuit takes 4 days to a week, and it takes about 15 days for carpenters to make ceilings, background walls, on-site cabinets, etc. After about 7 days, the renovation of the water circuit was completed, and the bricklayer began to enter the site to lay tiles, first the kitchen and bathroom, and finally the public part. The whole process lasted until about 30 days. Around the 15th day, the carpenter finished the work, and the oiler began to enter the site to carry out wall puttying and leveling, woodwork and wall painting, which should continue until twoorthree days before the completion of decoration. During this period, you can find your favorite furniture in the market to prepare for the style of decoration in the future

after the above construction is completed, the rest is basically the later stage of decoration. At this time, there are two or three days left before the completion of decoration, and the carpenter will come back to install curtain rods, hardware pendant, etc. The floors, doors, sanitary wares, cabinets, etc. ordered by the manufacturer have also begun to be installed in succession, and the ceilings of kitchens and bathrooms have to be carried out. These works are relatively simple and fast. Each kind of work only takes about 1 day, and it takes about 3 days to complete

furniture: it is appropriate to order more than 10 days in advance.

it is understood that the production cycle of furniture manufacturers is generally about 20 days. If the furniture is the product of foreign manufacturers, the arrival time will be longer

industry experts suggest that it takes 15 to 20 days to customize furniture such as wardrobes, which can be customized at the late stage of oil construction, that is, about 30 days after the commencement of construction, so that the furniture can be mobilized in time after the completion of construction

■ small reminder

imported products if the ordered products are imported products and there is no domestic goods, it will take a long time. Some products can arrive only after more than a month, but if there is stock, the time is similar to that of domestic products

customized products some products have finished products, which can be picked up directly, while customized products require a certain period of time before the manufacturer can produce them. Consumers should first ask about the situation when purchasing products

manufacturer's production cycle. The production cycle of each manufacturer's products is different, and it should be customized according to the manufacturer's production time for reasonable arrangement

the ordering time of building materials varies.

according to the introduction, the time for purchasing floors depends on whether the manufacturer has goods. If there are goods, they can generally be delivered and installed in a week. "Three bedrooms with more than 100 square meters can be installed in a day." A floor industry practitioner told the author, "but if the selected color and style manufacturers are out of stock, it is difficult to say when". He suggested that customers make an appointment with the manufacturer in advance

doors and cabinets are mostly customized products, and the production cycle of each manufacturer is different. Generally, it takes 20-35 days to produce them, which should be fixed in the middle of the decoration

ceramic tiles and sanitary wares are generally available in stock and can be picked up directly, but some ceramic tiles need to be cut, which may take a certain time

fabric curtain customization takes twoorthree days, which can be carried out in the later stage of the project